We are backfilled and passed Village inspection. Due to the rain our foundation is a swimming pool. Our PM called and said that on:
Tue: 3 piece roughin will go in.
Wed/Thu: concrete poured and sewer and water tie ins connected.
Fri: prep for framing.
Mon: framing starts weather permitting.
So at least progress is being made. I also researched the waterproofing that was used (Delta MS) and the reviews on it look good, so glad to see good products being used.



